Major Projects for EC

Saturday, July 30, 2011

List of major projects for electronics and communication engineering


Automated fuel tank servicing system for liquid engines of launch vehicle , Implementation of VIOP in southern railways , Embedded temperature detection and control system, d-Robot , Vehicle tracking and accident messaging system,  Advanced ATM, Bluetooth home automation, Track fault detection, Wide area network of national train enquiry system

List of Minor Projects for EC

Friday, July 29, 2011

List of minor projects for electronics and communication engineering


Unmanned highway patrolling system, Four channel CRO adaptor, Smart house, Intelligence music and security system, GPRS based air security monitoring system, Automatic bus punching system, MRI image retrieval using representation and description, Centralized system for runway illumination, monitoring and control, Intelligent mobile tracker, Radio frequency identification (RFID) based railway ticketing system, Noise muting FM receiver, speed tracer, Remote controlled robotic vehicle

How to test or check op-amp uA 741

Tuesday, July 12, 2011

How to test or check op-amp uA 741

Connect the V+ and V- supply.
Connect any one of the input terminal to the ground.
Connect output terminal to the CRO.
Carefully touch the other input terminal with hand.
If the output is square wave, the op-amp is good.
                            
                          OR


 










Connect the V+ and V- supply.
Feed a 100 mV sine wave at the input (Vin) and verify whether the output is a square wave swinging from +13V to -13V approximately.